Centre for Equal Access Develoment-Nepal (CEAD)/GIZ
March, 2021 - December, 2022 • Develop and implement support tools and techniques for conducting household surveys, Focus Group Discussions, and observations, with a specific focus on the energy sector in 20 municipal level of Sudoorpaschim province. • Monitor and supervise data enumerators in the field to ensure quality data collection. • Facilitate interviews and support data collection efforts during surveys. • Conduct FGDs, enterprise and institution surveys, infrastructure surveys, and household surveys in both rural municipalities and municipalities. • Analyze survey data using statistical software and other relevant tools. • Ensure data quality and maintain comprehensive records of data collected during surveys. • Prepare reports based on survey findings for stakeholders and other interested parties. • Stay up-to-date with trends and developments in survey methodologies and best practices, and apply this knowledge to improve survey processes and outcomes. • Conduct orientation sessions at the municipal level to ensure effective implementation of Municipal Energy Plan. • Support other technical service providers in areas such as biomass, solar, community electrification, productive energy use and other Renewable Energy Technologies. • Monitor and regularly follow up on the progress and achievements of the Municipal Energy Plan. • Provide support to Municipalities and Rural Municipalities (RMs) for developing Municipal Energy Plans. • Coordinate and establish linkages with related stakeholders to ensure effective collaboration. • Work within organizational rules and support the organization's other work. • Manage every event report, including documenting and sharing key findings and recommendations to improve future surveys and plans.
Rural Water Supply and Sanitation Fund Development Board
February, 2021 - March, 2021 Monitoring of Project Sites
Rural Development Service Centre/UK-Aid (ANUKUKAN-X/BRACED Project)
August, 2016 - December, 2018 • Conduct feasibility study and engineering survey, design, cost estimate and construction supervision related to Multiple Use water Systems (MUS), Solar MUS, Micro Irrigation Technologies (MITs), water harvesting tanks, recharge ponds, Hydrams, Collection Centre and other DRR mitigation activities identified through LAPA. • Support District Coordinator on the planning and implementation of the water component of the project in close coordination with Regional Engineer. • Support PC, DC and other ANUKULAN staff to generate matching resources to implement the water technologies at the pocket level. Provide full support and assistance to PC and DC to develop detailed implementation plan (DIP) of water technologies under water component. • Lead water technologies under water component to implement effectively in district as per DIP and ensure that is being implemented as per DIP, strategy and guidelines of ANUKULAN. • Work closely with agriculture technicians to make sure that farmer's fields are suitable for high value crops and they are willing to grow vegetables. Works closely with social mobilizers to identify the sites for water technology implementation that are socially appropriate. Assist social mobilizer (SM) to set up a MUS user group and mobilize the group to establish Repair and Maintenance (R & M) funds. Also assist SM for provision of care taker and R and M funds are collected regularly. • Make sure that the district program officer has well understood and recommended the implementation of MUS and MIT are appropriate for a particular community in view of MUS linkages on agriculture and local markets. • Exploration of opportunities for working together with other development partners for the promotion of MIT, Collection centers, Hydram, recharge pond & MUS (gravity as well as solar) in the project district.
Rural Development Service Center Nepal/SNV
April, 2015 - August, 2016 • Identify potential areas for the Improved Water Mill Electrification project and conduct feasibility studies. • Provide technical support to Village Electrification Committees in project planning, implementation, and monitoring. • Supervise construction and installation works, ensuring that they are completed within the specified timelines and budget. • Understand project requirements and coordinate with resources to ensure that the projects are executed in the right direction and in a timely manner. • Manage change and effectively communicate information down the line to concerned teams for smoother execution. • Delegate and allocate responsibilities efficiently to manage the project end-to-end. • Provide direction and technical expertise in design, development, and systems integration. • Make quick decisions and solve technical problems to provide an efficient environment for project implementation. • Identify resource and equipment requirements, efficient capacity planning and manage software and hardware availability.
Rural Development Service Center Nepal/SNV
April, 2015 - August, 2016 • Identify potential areas for the Improved Water Mill Electrification project and conduct feasibility studies. • Provide technical support to Village Electrification Committees in project planning, implementation, and monitoring. • Supervise construction and installation works, ensuring that they are completed within the specified timelines and budget. • Understand project requirements and coordinate with resources to ensure that the projects are executed in the right direction and in a timely manner. • Manage change and effectively communicate information down the line to concerned teams for smoother execution. • Delegate and allocate responsibilities efficiently to manage the project end-to-end. • Provide direction and technical expertise in design, development, and systems integration. • Make quick decisions and solve technical problems to provide an efficient environment for project implementation. • Identify resource and equipment requirements, efficient capacity planning and manage software and hardware availability.
Rural Deveopment Service Center
June, 2011 - March, 2015 • Manage and deliver various Solar Water Pumping related projects from feasibility stage through to detailed design and site implementation. • Liaise with all parties involved in a project, including contractors, stakeholders, and local communities. • Monitor resources and maintain progress against budgets. • Oversee the actual construction on the ground, ensuring that all work is completed safely, efficiently, and to a high standard. • Deal with complaints from local people experiencing disruption due to construction works, ensuring that issues are resolved promptly and effectively. • Organize human and material resources on site, ensuring that they are utilized efficiently and effectively. • Undertake technical and feasibility studies, including site investigations, to inform project planning and design. • Use a range of computer packages for developing detailed designs, ensuring that all plans are accurate and up-to-date.
Samaj Sewa Doti
January, 2011 - June, 2011 • Monitor project sites in search of appropriate resources available. • Survey feasible projects to determine project viability. • Design projects that are to be handed to the community. • Properly monitor construction works, ensuring they are completed safely, efficiently, and to a high standard. • Maintain proper bills and amounts of cash receipts, ensuring accurate record-keeping throughout the project. • Finalize projects in a proper manner, ensuring all objectives have been met and all stakeholders are satisfied with the final outcome.
West Point Engineering Consultancy
August, 2009 - January, 2011 • Survey of Buildings, Roads, Water Supply, Irrigation and other engineering works. • Design of Buildings, Roads, Water Supply, Irrigation • BOQ of the projects • Valuation of projects
Tribhuwan University
Doti Multiple Campus, 2022
CTEVT
Seti Technical School, 2009